An Assistant Engineer was asked
Q. What is segregation?
Ans. 

Segregation is the separation of different components of a mixture based on their physical properties.

  • Segregation occurs when particles of different sizes, shapes, or densities separate from each other.

  • For example, in a concrete mix, larger aggregates tend to settle at the bottom while smaller particles rise to the top.

  • Segregation can also occur in granular materials like sand and gravel during handling and transp...

An Assistant Engineer was asked
Q. What is the minimum cement content required for M30 grade concrete?
Ans. 

Minimum cement required for M30 grade of concrete is 320 kg.

  • M30 grade of concrete requires a minimum cement content of 320 kg/m3

  • The cement content may vary based on factors such as water-cement ratio, aggregate type, and quality of cement used

Assistant Engineer Interview Questions Asked at Other Companies

Q1. How do we measure the slump of concrete during casting? Is there ... read more
Q2. Why do we take only 1 set of cube samples when casting concrete o ... read more
asked in Randstad
Q3. 1.Define the term capacitance & inductance 2.what is Rectifie ... read more
Q4. What is the 5S methodology, and why is it important in an industr ... read more
asked in TCE
Q5. What provisions do you check when designing a beam/column accordi ... read more
An Assistant Engineer was asked
Q. What is the difference between CMDI and HDPE?
Ans. 

CMDI and HDPE are two different types of plastic materials used in various applications.

  • CMDI stands for Chlorinated Polyethylene Modified Polyethylene and is a thermoplastic elastomer used in wire and cable insulation, automotive parts, and roofing membranes.

  • HDPE stands for High-Density Polyethylene and is a thermoplastic polymer used in packaging, pipes, and construction materials.

  • CMDI has better resistance to ch...

An Assistant Engineer was asked
Q. If concrete casting is interrupted by two days of rain, what bonding agent is suitable for recasting the concrete?
Ans. 

The right bonding agent for recasting of concrete after rain would be a polymer-modified cementitious bonding agent.

  • The surface should be cleaned and dried before applying the bonding agent.

  • The bonding agent should be applied in a thin layer using a brush or roller.

  • The recasting of concrete should be done within the specified time frame mentioned by the bonding agent manufacturer.

  • Examples of polymer-modified cemen...

What people are saying about Nagarjuna Construction Company

View All
a deputy project manager
1w
Stuck at Cross roads : Loyalty vs Financial relief
Hi All, Right now I was working in a Good construction company with Medium range salary with good working culture and supporting seniors and colleagues who supported me in tough situations, but my financial situation is too worse I am in a position that I am unable manage my monthly expenses and Loans, literally lost all my respect among family members. Now I got an offer from India's top construction company with approx salary hike of 35%. Someone already informed to management that I am planning to leave even before I got my offer.Now they keep on asking me to stay back and whatever be the financial situation they will sort out. I am unable to take decision that I have to accept the offer and move or stay with my current organisation. Please suggest
Got a question about Nagarjuna Construction Company?
Ask anonymously on communities.
An Assistant Engineer was asked
Q. Describe shear force and bending moment, and explain how to calculate them.
Ans. 

Shear force is the force perpendicular to the beam and bending moment is the torque that causes bending of the beam.

  • Shear force is calculated by finding the algebraic sum of all the forces acting on one side of the beam.

  • Bending moment is calculated by finding the algebraic sum of all the moments acting on one side of the beam.

  • Shear force and bending moment diagrams are used to visualize the distribution of these f...

An Assistant Engineer was asked
Q. Why do we take only 1 set of cube samples when casting concrete of 5 cubic meters or less?
Ans. 

Only 1 set of cube sample is taken at a casting of concrete of 5 or less than 5 Meter cube to save cost and time.

  • Taking multiple samples would increase the cost of testing.

  • The strength of concrete is usually consistent within a small volume.

  • ASTM C31 allows for only 1 set of samples for small volume concrete.

  • If the first set of samples fails, additional samples can be taken for verification.

Nagarjuna Construction Company HR Interview Questions

62 questions and answers

Q. How do you manage pressure and adapt to last-minute changes?
Q. Where do you envision yourself in the next 3 to 5 years?
Q. What qualifications and experiences make you a suitable candidate for the p ... read more
An Assistant Engineer was asked
Q. How do we measure the slump of concrete during casting? Is there a difference in slump value when casting concrete at a height of 50 meters or in high-rise buildings?
Ans. 

Slump for casting of concrete is measured using a cone. Slump value may decrease as height increases in high rise buildings.

  • Slump is measured using a cone and the difference between the height of the cone and the height of the concrete after it settles is the slump value.

  • As height increases in high rise buildings, the pressure on the concrete increases, which may cause the slump value to decrease.

  • To maintain the d...

Are these interview questions helpful?
An Assistant Engineer was asked 4mo ago
Q. Type of pile
Ans. 

Piles are deep foundation elements used to transfer loads to deeper soil layers, enhancing stability and support.

  • Types of piles include: driven piles, bored piles, and screw piles.

  • Driven piles are pre-fabricated and hammered into the ground, e.g., concrete or steel piles.

  • Bored piles are cast in-situ by drilling a hole and filling it with concrete, suitable for weak soils.

  • Screw piles have helical blades and are rot...

An Assistant Engineer was asked 9mo ago
Q. Some workings activities of Building construction
Ans. 

Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.

  • Excavation: Digging the foundation and preparing the site

  • Foundation work: Pouring concrete and setting the foundation

  • Framing: Building the structure's skeleton with wood or steel beams

  • Roofing: Installing the roof materials

  • Electrical work: Wiring the building for electricity

  • Plumbing: Inst...

An Assistant Engineer was asked 9mo ago
Q. Details for RCC road construction with specifications
Ans. 

RCC road construction involves using reinforced concrete for durability and strength.

  • RCC stands for Reinforced Cement Concrete

  • Specifications include using high-quality cement, aggregates, and steel reinforcement

  • Proper compaction and curing are essential for durability

  • Thickness of the RCC road depends on traffic load and subgrade conditions

  • Joint spacing should be as per design specifications

Nagarjuna Construction Company Assistant Engineer Interview Experiences

17 interviews found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Details for RCC road construction with specifications
  • Ans. 

    RCC road construction involves using reinforced concrete for durability and strength.

    • RCC stands for Reinforced Cement Concrete

    • Specifications include using high-quality cement, aggregates, and steel reinforcement

    • Proper compaction and curing are essential for durability

    • Thickness of the RCC road depends on traffic load and subgrade conditions

    • Joint spacing should be as per design specifications

  • Answered by AI
  • Q2. Some workings activities of Building construction
  • Ans. 

    Building construction activities include excavation, foundation work, framing, roofing, electrical work, plumbing, and finishing.

    • Excavation: Digging the foundation and preparing the site

    • Foundation work: Pouring concrete and setting the foundation

    • Framing: Building the structure's skeleton with wood or steel beams

    • Roofing: Installing the roof materials

    • Electrical work: Wiring the building for electricity

    • Plumbing: Installin...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Abouts salaries and accommodation
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Oct 2020, where I was asked the following questions.

  • Q1. Type of pile
  • Ans. 

    Piles are deep foundation elements used to transfer loads to deeper soil layers, enhancing stability and support.

    • Types of piles include: driven piles, bored piles, and screw piles.

    • Driven piles are pre-fabricated and hammered into the ground, e.g., concrete or steel piles.

    • Bored piles are cast in-situ by drilling a hole and filling it with concrete, suitable for weak soils.

    • Screw piles have helical blades and are rotated ...

  • Answered by AI
  • Q2. Super structure
  • Q3. Baar bending shedule
  • Q4. Billing and sub
  • Q5. Client billing and
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
  • Q1. Questions ask like Qc and execution and some questions from IS code interview was held in fully English language
  • Q2. Go and do interview preparation from Qc and execution and IS code

Assistant Engineer Interview Questions & Answers

user image MD AZHARUDDIN

posted on 6 Jul 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jul 2024, where I was asked the following questions.

  • Q1. Distribution Works related Questions Asked examples, Electrical Network or Substation Switch yard .
  • Q2. What are your strengths, and how does your family background influence them?
  • Ans. 

    My strengths include adaptability, problem-solving, and teamwork, shaped by my family's values and experiences.

    • Adaptability: Growing up in a diverse environment taught me to adjust quickly to new situations.

    • Problem-solving: My parents encouraged critical thinking, which helped me tackle engineering challenges effectively.

    • Teamwork: Family projects instilled the importance of collaboration, enhancing my ability to work w...

  • Answered by AI
  • Q3. Ready to run our teams every positive responsibility.
  • Ans. 

    I am committed to embracing every responsibility to enhance team performance and achieve our goals effectively.

    • Emphasize teamwork: Collaborate with colleagues to ensure all tasks are completed efficiently, like organizing regular team meetings.

    • Take initiative: Volunteer for challenging projects, such as leading a new engineering design, to demonstrate leadership and responsibility.

    • Communicate effectively: Keep all team...

  • Answered by AI
  • Q4. What motivates you to join our organization?
  • Ans. 

    I am motivated to join your organization due to its innovative projects, commitment to excellence, and opportunities for professional growth.

    • Your organization's reputation for cutting-edge technology aligns with my passion for engineering innovation.

    • I admire your commitment to sustainability and would love to contribute to projects that make a positive environmental impact.

    • The collaborative work culture here excites me...

  • Answered by AI
  • Q5. Self behaviour represent to other people

Interview Preparation Tips

Interview preparation tips for other job seekers - Before Prepared with Company work culture and history of everything ok with the take new responsebility
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What is unite weight of steel 16mm?
  • Ans. 

    The unit weight of 16mm steel is approximately 0.615 kg/m.

    • Unit weight is crucial for calculating the total weight of steel in construction.

    • For 16mm diameter steel bars, the unit weight is about 0.615 kg/m.

    • Example: A 12-meter long 16mm steel bar weighs approximately 7.38 kg (0.615 kg/m * 12 m).

    • Unit weight can vary slightly based on the steel grade and manufacturing process.

  • Answered by AI
  • Q2. What is density of steel?
  • Q3. What is ph value

Assistant Engineer Interview Questions & Answers

user image Shailesh keshri

posted on 4 Dec 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. In which type of structures do you work currently?
  • Ans. 

    I currently work on various civil engineering structures, including bridges, buildings, and infrastructure projects.

    • Bridges: Designing and analyzing load-bearing structures for transportation.

    • Buildings: Working on residential and commercial projects, focusing on safety and sustainability.

    • Infrastructure: Involvement in roads, highways, and utilities to enhance urban development.

  • Answered by AI
  • Q2. What is the grade of concrete you use in your project or working Structures?
  • Ans. 

    The grade of concrete used depends on structural requirements, typically ranging from M20 to M50 for various applications.

    • M20 is commonly used for residential buildings and pavements.

    • M25 is often used for medium-strength structures like beams and slabs.

    • M30 is suitable for high-rise buildings and industrial structures.

    • M40 and M50 are used in specialized applications like bridges and high-strength components.

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. What is your total experience?
  • Ans. 

    I have over 5 years of experience in engineering, focusing on project management and technical design in various sectors.

    • Worked on multiple projects, including a bridge construction that improved local traffic flow.

    • Led a team of engineers in developing a new software tool that increased efficiency by 30%.

    • Conducted regular site inspections to ensure compliance with safety regulations and quality standards.

    • Collaborated w...

  • Answered by AI
  • Q2. How much salary would you expect?
  • Ans. 

    I am looking for a competitive salary that reflects my skills and experience, ideally in the range of $X to $Y.

    • Research industry standards: For example, similar roles in my area typically offer between $X and $Y.

    • Consider my experience: With X years in the field, I believe a salary towards the higher end of that range is justified.

    • Discuss benefits: I value a comprehensive benefits package, which can influence my salary ...

  • Answered by AI

Assistant Engineer Interview Questions & Answers

user image Krishna Gore

posted on 17 Jul 2024

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. About previous work experience
  • Q2. Difficulties in work

Assistant Engineer Interview Questions & Answers

user image Md Amir Raza

posted on 11 Jan 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. All Civil basics knowledge as per your cv and experience.
  • Q2. Size of covering block
  • Ans. 

    The size of covering block is determined based on the type of structure and its requirements.

    • The size of covering block is usually specified in the design drawings or specifications.

    • It is important to consider the dimensions and spacing of reinforcement bars when determining the size of covering block.

    • The covering block should provide adequate protection to the reinforcement bars from fire, corrosion, and other environ...

  • Answered by AI
  • Q3. Length of development
  • Ans. 

    The length of development refers to the duration it takes to complete a project or task.

    • The length of development can vary depending on the complexity of the project.

    • Factors such as team size, resources, and scope can also impact the length of development.

    • It is important to set realistic timelines and milestones to ensure efficient development.

    • For example, a simple website development project may take a few weeks, whil...

  • Answered by AI
  • Q4. Bending moment and Soil test
  • Q5. Construction materials in details
  • Ans. 

    Construction materials are substances used for building and construction purposes.

    • Construction materials include cement, concrete, bricks, steel, wood, and glass.

    • Cement is a binding agent used in the production of concrete.

    • Concrete is a mixture of cement, sand, gravel, and water, used for construction.

    • Bricks are rectangular blocks made of clay or concrete, used for building walls.

    • Steel is a strong and durable material ...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Assistant Engineer interview:
  • Structural Analysis
  • Cost Estimation
  • Quality Control
  • Bmcp
Interview preparation tips for other job seekers - Try to join through Head office.Never join through Regional office Or Site office.
Because you will get salary, increament everything good if you join directly through head office Hyderabad.
Visit website and submit Cv there.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Describe the whole process of piling
  • Ans. 

    Piling is a construction technique used to strengthen the foundation of a building by driving piles into the ground.

    • Piling involves driving long, slender columns (piles) into the ground to provide support for structures.

    • The process starts with site investigation to determine soil conditions and load-bearing capacity.

    • Piles can be made of concrete, steel, or timber, depending on the project requirements.

    • Piles are driven ...

  • Answered by AI
  • Q2. How to prepare BBS

Interview Preparation Tips

Interview preparation tips for other job seekers - Give your answer honestly
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Process of Transmission line construction
  • Ans. 

    Transmission line construction involves planning, design, material procurement, site preparation, tower erection, conductor stringing, and testing.

    • Planning involves route selection, environmental impact assessment, and obtaining necessary permits.

    • Design includes determining tower locations, conductor size, and insulator type.

    • Material procurement involves sourcing towers, conductors, insulators, and hardware.

    • Site prepar...

  • Answered by AI
  • Q2. Explained right from survey to foundation to erection, Stringing and commissioning

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Assistant Engineer interview?
Nagarjuna Construction Company interview process usually has 1-2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical, Resume Shortlist and HR.
How to prepare for Nagarjuna Construction Company Assistant Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Nagarjuna Construction Company. The most common topics and skills that interviewers at Nagarjuna Construction Company expect are Commissioning, Execution, Hydro Testing, MSP and Metro Rail.
What are the top questions asked in Nagarjuna Construction Company Assistant Engineer interview?

Some of the top questions asked at the Nagarjuna Construction Company Assistant Engineer interview -

  1. How do we take slump for casting of concrete and what if when we go rise about ...read more
  2. Why do we take only 1 set of cube sample at a casting of concrete of 5 or less ...read more
  3. What if we r doing a casting of concrete and in the meantime rain comes and con...read more
How long is the Nagarjuna Construction Company Assistant Engineer interview process?

The duration of Nagarjuna Construction Company Assistant Engineer interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Overall Interview Experience Rating

4.5/5

based on 26 interview experiences

Difficulty level

Moderate 89%
Hard 11%

Duration

Less than 2 weeks 89%
4-6 weeks 11%
View more
Nagarjuna Construction Company Assistant Engineer Salary
based on 839 salaries
₹3.9 L/yr - ₹8.4 L/yr
46% more than the average Assistant Engineer Salary in India
View more details

Nagarjuna Construction Company Assistant Engineer Reviews and Ratings

based on 298 reviews

4.1/5

Rating in categories

3.9

Skill development

3.8

Work-life balance

3.9

Salary

4.2

Job security

3.9

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 298 Reviews and Ratings
Junior Engineer
984 salaries
unlock blur

₹2.2 L/yr - ₹6 L/yr

Assistant Engineer
841 salaries
unlock blur

₹3.9 L/yr - ₹8.4 L/yr

Junior Engineer Civil
428 salaries
unlock blur

₹2.2 L/yr - ₹7.5 L/yr

Senior Engineer
410 salaries
unlock blur

₹4.8 L/yr - ₹11.1 L/yr

Assistant Engineer - Civil
296 salaries
unlock blur

₹3.7 L/yr - ₹7.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.2
Compare
write
Share an Interview